EXPERIENCE DESIGNER
Iām a designer obsessed with problems ā Let me solve yours.
FEATURED WORK
PROBLEM
System-directed Putaway tasks launched without a key exception path, blocking rollout until we could deliver a fast, reliable way to skip unusable locations with the visibility needed to resolve problems and keep inbound work flowing.
IMPACT
š $312k Annual Labor Savings through improved task sequencing and WIP insights (projected)
š High 87.5 Usability Score (UMUX-L) captured from pilot participants after 2 days of use
ā³ Reduced Research Time through improved visibility and fewer recurring issues over time
Putaway Skip Location
PROBLEM
A fragmented and repetitive process to remove empty trailers from dock doors regularly caused delays and confusion between Inbound and Yard operations, and no systemic trigger existed to introduce automation.
IMPACT
ā³ Decreased time on task by 30 seconds per trailer through reduced manual steps (10m saved for every 20 trailers worked)
š Reduced risk of errors and safety incidents through physical verification requirements
Release Trailer
PROBLEM
Legacy process required inbound freight to be moved into storage locations before being used for outbound orders, creating redundant labor when the same product is received and shipped on the same day.
IMPACT
š $1.2M Annual Labor Savings through reduced touches and increased CPH (projected)
ā³ Decreased time on task by 10 minutes for Stocking DCās & 45 seconds for Flatbed DCās
Opportunistic Cross-Dock
Proven Results